УДК 4И(АНГЛ):658.011
ЭКОНОМИЧЕСКАЯ ЭФФЕКТИВНОСТЬ МЕРОПРИЯТИЙ ПО ЛИКВИДАЦИИ ВНУТРИСКВАЖИННЫХ ОСЛОЖНЕНИЙ И АВАРИЙ (ECONOMIC EFFICIENCY OF MEASURES TO ELIMINATE DOWNHOLE COMPLICATIONS AND ACCIDENTS)
Николаева Н.С.
(к.ф.н., доцент кафедры иностранных языков Губайдуллина Г.Т.) Альметьевский государственный нефтяной институт
Production well is a durable sealed channel for transporting oil and gas. It is achieved through the well casing. Providing this condition is the main task of primary cementing of oil and gas wells. Poor lining can be a source of complications during the entire life of wells, causing the need for workover operations.
Also, the most significant costs for non-productive work during workover occur during repeated operations. For this reason, the main share of the activities developed by the specialists of service EDCA LAC "Tatneft-AlmetevskRemServis" aimed at reducing these works.
In particular, when cleaning out the downhole in 2012, slaughtering cleaning algorithm was developed and introduced to the work. The need for magnetic catchers in the well 1 reached to 10 RIH and POOH and more. Therefore, it was decided not to clean the bottom of tubing but the cable that will reduce much time to 1 RIH AND POOH. Thus, in 2012 the total duration of the work to clean up the bottom and the "head" emergency deep pumping equipment after washing up reduced from 36.48 hours to 7.07 hours. The total economic effect per well in 2012 amounted to 65300 rubles (including taxes - 52 240 rubles).
Also, by the specialists of service EDCA it was proposed additionally to be insured via elevators type EH / 1 when lifting assembly on the cutting line, and the rise of the last 10-20 pcs. tubing with additional insurance. Thus, the duration of work decreased by 37.39 per hour, and the economic effect of one well was 722,271 rubles.
Thus, the implementation of these activities contributes to time savings for workover operations and, as a consequence. Successful elimination of accidents by 97% was achieved by the specialists of service EDCA reduce repair
ЛИТЕРАТУРА:
1. Курочкин Б. М. Техника и технология ликвидации осложнений при бурении и капитальном ремонта скважин. Том 2 /М.:ОАО «ВНИИОЭНГ»,2008.
2. Савицкая Г. В. Анализ хозяйственной деятельности предприятия: Учебник- М.: ИНФРА-М, 2009
279

Оглавление Вид:     Страница: из <<< Назад |



Все представленые произведения являются собственностью библиотеки Альметьевского государственного нефтяного института и предназначены для ознакомительного прочтения в методических целях в поддержку процесса обучения

Альметьевский государственный нефтяной институт, 2004 - 2024г.
423450 Республика Татарстан,
г.Альметьевск, ул. Ленина д.2
e-mail: fb@agni-rt.ru